TYR-568 is a general-purpose rutile titanium dioxide pigment manufactured by the chloride process and coated with Al2O3 and special organic surface treatment. TYR-568 is specifically designed to show high processing performance where high concentrations of pigment are required in thermoplastic masterbatches. FEATURES• Bluish undertone• Strong hiding power and strong tinting strength• Excellent dispersibility in thermoplastics and dry blending operations• High processing performance due to the minimal Effect on Melt FlowTechnical Specification
TIO2 content % |
≥96.0 |
Volatile at 105°C |
≤0.3 |
PH |
6.5-8.5 |
Oil absorption |
≤16 |
Sieve Residue % (26μm) |
≤0.01 |
TCS (Tinting strength) |
≥1900 |
Rutile content |
≥99.0 |
Resistivity (Ω.m) |
≥100 |
CIE L* (Linseed Oil System) |
≥ 97.0 |
CIE b* (Linseed Oil System) |
≤ 2.0 |
ISO591-1:2000(E) |
R2 |
ASTM D476-00 |
V |
|
|
Surface treatment: Al2O3, ZrO2 and Organic treatments
Graded standard: ISO591:R2: ASTM D-476-84:(IV)
Principal Applications
* Engineering plastics like PE, PP, ABS, PVC
* Highly loaded thermoplastics masterbatches
Safety & Health
If inhaled, move to fresh air immediately; If eye contacted, rinse thoroughly with plenty of water; call a physician if necessary.
Product Packaging
The product packaging bag is comprised of three layers of paper, with each bag weighing 25kg. Different types of packaging can be organized in accordance to consumer needs
Storage & Transportation
Products should be stored in a ventilated and dry storage in batches. Do not store product directly on the ground. They should be separated by items such as trays or plastic sheets.
Keep out of contact with the reactive chemicals. Carefully load and unload during transportation. The same batch of products should be placed together to prevent packaging contamination/damage.
Shipping Type |
Types |
Lead Time |
Processing Time |
 |
DHL |
Samples(100g-1kg) |
2-7 days |
Shipping fee depend on different zone and country |
 |
FedEX |
Samples(100g-1kg) |
2-7 days |
By Sea |
Cargos |
5-22 working days |
By Train |
Cargos |
5-22 working days |
By Truck |
Cargos |
5-22 working days |